A shared-housing permit is required before a unit is allocated. It lasts one year, or two if the owner asks, and renewal is due at least 30 days before it ends.
Law No. 4 of 2026, Articles 8, 9 and 10. Dubai Municipality PDF.
Matches the statute. A public publication of 8 Oct 2026 said the same.
Existing homes have until 8 September 2027 to regularise, unless the Director General extends that once.
Article 37, counted from gazette publication. Circular of 7 Sep 2026 and Dubai Media Office, 7 Oct 2026, both state 8 Sep 2026 to 8 Sep 2027.
Matches official sources. A news report’s 26 August date counted 180 days from the 27 February signature, not from the gazette.
Every printed or digital ad shows the establishment’s approved trade name and the permit number, and must not be misleading.
Article 27 of the law PDF.
Confirmed in the official text. Both fields are mandatory on every real card.
The whole building or villa is one category only: individual or family. They cannot be mixed.
Dubai Municipality circular, point 10, and Dubai Media Office, 7 Oct 2026. The technical guide also says one category per unit.
Matches. ShareSpaces stores the category on the building and refuses a second category under the same permit.
At least 5 m² of bedroom per person, rounded down.
Technical guide, and Dubai Media Office, 7 Oct 2026.
Matches. 12 m² is 2 people, not 3.
At least 1 m² of kitchen per person, and at least one bathroom per 4 people.
Technical guide PDF. Not restated in the Media Office press release.
Taken from the official guide. Not in a public publication of 8 Oct 2026.
Family housing: one separate bedroom per family, with an en-suite bathroom.
Technical guide, and Dubai Media Office, 7 Oct 2026.
Matches.
Individual housing needs kitchen, bathrooms, dining, recreation, laundry, and a place to dry clothes.
Technical guide. The Media Office release lists the first five of those.
The drying space is in the guide and was not in that public publication.
Bani Yas Road, Sheikh Zayed Road, Jumeirah Road, and Al Wasl Road are family only.
Technical guide. Not in the Media Office press release.
Taken from the official guide.
A tenant cannot sublet.
Article 11.
Matches. The wizard blocks tenant subletting.
Fines from AED 500 to AED 500,000, doubled on a repeat, capped at AED 1,000,000.
Article 29.
Matches the statute and a public publication of 8 Oct 2026.
Six areas named as approved: Al Souq Al Kabeer, Al Ras, Al Warqa 1, Al Barsha 1, Al Muraqqabat, Al Rigga. More than 44 areas in total.
Dubai Media Office, 7 Oct 2026. The full list of names is from a public publication of 8 Oct 2026.
The six names are official. The rest, and the designated-parts split, are marked “not yet confirmed by an official source”.